Con Dao Special Zone
Repair and maintenance of channel entry buoys and mooring buoys at the storm shelter anchorage
Tay Ninh Province (formerly)
Construction of navigation buoys and signs on the Vam Co Dong inland waterway, from Ben Keo Port to Vam Trang Trau
PTSC Port, No. 65A, Rach Dua Ward, Ho Chi Minh City
Construction of a closed warehouse — 30x98m, area 2,940m²
Construction works — upgrading Roads A5 & B1
Con Dao District, Ba Ria – Vung Tau Province (formerly)
Construction — annual management and maintenance of the inland waterway buoy system
Dong Nai Province
Construction — management and regular maintenance of inland waterways, 2023
PTSC Port, No. 65A 30/4 Street, Rach Dua Ward, Ho Chi Minh City
Construction works — designed route length 724m
Sao Mai – Ben Dinh Oil & Gas Marine Service Base, Rach Dua Ward, Ho Chi Minh City
Construction works — designed route length 851m
Construction works — upgrading the drainage system
Ho Chi Minh City
Construction and upgrade works